Beginning: 23.09.2023 – 10.00 PM
Ending: 24.09.2023 – 04.00 AM
Internal ref: DTCAB-4309
Impact: Disturbances on internet links
Dear customer, dear partner,
In the continuity of our core network upgrade, our network engineer team will process an important maintenance during the night of the 23rd of September 2023.
During this timeframe, impacts are expected as follow :
• From 10.00 PM we will have few packet loss for DSL
• From 10.00 PM we will have some link access disconnections
• Load balance will be done after midnight ( disconnections )
• we will have BGP convergence for foreign traffic ( 5 packet loss )
No intervention is needed from your side.
Best regards;
SEWAN Technical Team